Preparation of the final cost-benefit analysis (CBA) of the M43 expressway (Szeged-Makó)

Info

Preparation of cost-benefit analysis (CBA) required for the closure of the project named “Section between M43 motorway Szeged – Makó (3+000 km no. – 34+600 km no.)”


Client:

NIF Zrt.


magyargergelyPreparation of the final cost-benefit analysis (CBA) of the M43 expressway (Szeged-Makó)